Ultimate Roof Waterproofing Solutions with Mirai WPM & Mirai Seal (Complying to BIS 15909:2020)
Raphe mPhibr, a leading innovator in UAV technology and advanced composite materials, is developing a state-of-the-art operational headquarters in Noida’s Sector 80. This facility is designed to enhance research, manufacturing, and operational capabilities, reinforcing Raphe MPhibr’s commitment to technological excellence in the defense and aerospace sectors.
- Main Client: Raphe Mbhibr 200
Raphe mPhibr, Raphe in short, is a hi-tech aerospace company designing and manufacturing comprehensive & customised UAV (Unmanned Aerial Vehicle) solutions, tested across terrains and weather conditions, with a million+ km traveled across India. - Client: SS Constructions
SS Constructions an organization in the field of civil construction for carrying out all types of civil jobs, started by the Managing Director Mr. Satish Suri in the year 1978.
It is a group of professionally managed team of qualified engineers, supervisors, foremen and skilled manpower backed up by proper infrastructure and machineries.
Raphe Mphibr is a prestigious defense facility requiring a robust waterproofing solution for its composite steel slabs. These slabs are engineered to transfer loads efficiently through direct bearing, bonded interactions, or shear connectors, ensuring structural integrity and durability.
We recommend a cutting-edge dual-layer system, featuring MIRAI SEAL, a high-performance polyurethane coating as the initial layer, provides exceptional flexibility, superior adhesion, and outstanding impact resistance, applied at a precise 1.8 to 2.0mm thickness. This is complemented by a robust 1.2mm thick MIRA WPM (PVC membrane) as the second layer, delivering unparalleled waterproofing capabilities. Together, these layers ensure superior durability and long-lasting protection, offering an advanced solution for demanding environments. Mirai Seal have high elongation while Mirai WPM have high Tensile Strength.
- Mirai Seal: The procedure for applying Mirai Seal with Mirai WBE Primer involves cleaning and preparing the surface, applying the Mirai WBE Primer for adhesion, followed by two coats of Mirai Seal (allowing proper curing between each coat), ensuring full coverage and a seamless waterproofing barrier.
- Mirai WPM: After applying Mirai Seal, the Mirai WPM PVC membrane is laid over the cured surface by aligning and adhering it seamlessly, ensuring proper bonding and overlap at joints, followed by adhesive application to secure the membrane for optimal waterproofing performance.
Project Statistics:
- Total area to be waterproofed in our scope : 16000 sqft
- Total amount of MIRAI Seal : 16000 sqft
- Total amount of MIRAI WPM : 16000 sqft