Advanced Waterproofing Solutions with Mirai Seal and Mirai WPM(Complying to BIS 15909:2020)

The SAS Software Building is a state-of-the-art commercial facility being developed in Noida, Sector 142, to serve as a modern workspace for SAS Software and its employees. The project involves the construction of a technologically advanced, energy-efficient, and aesthetically appealing office building equipped with world-class infrastructure and amenities. 

Project

SAS Software Sector 142,Noida

Location

Noida ,UP (INDIA)

Client

SAS Software Pvt. Ltd.

  • Main Client: SAS Software Pvt Ltd. 
    With a passion for analytics, SAS saw lines of code as the key to something extraordinary. Fast forward more than four decades later, and SAS has thousands of employees and customers in locations worldwide, analysing billions of rows of data every second that are changing how we live. 
  • Contractor: Capital Heights 
    Capital Heights have tremendous amount of experience in developing Grade A commercial/IT-ITES projects, turnkey building & leasing solutions across India. Capital Developers are renowned for their unrivalled construction quality coupled with service excellence & timely completion, a trait that has helped the company emerge as a prominent developer and earn the goodwill of its clients trust of its investors. 

Capital Heights encountered considerable difficulties in finding a waterproofing solution that not only provided durability but also met the aesthetic requirements for the podiums and raft of their SAS Software Project. They recognized our expertise in delivering a solution that addressed both functional and visual needs effectively. 

We recommend a cutting-edge dual-layer system, featuring MIRAI SEAL, a high-performance polyurethane coating as the initial layer, provides exceptional flexibility, superior adhesion, and outstanding impact resistance, applied at a precise 1.8 to 2.0mm thickness. This is complemented by a robust 1.2mm thick MIRA WPM (PVC membrane) as the second layer, delivering unparalleled waterproofing capabilities. Together, these layers ensure superior durability and long-lasting protection, offering an advanced solution for demanding environments. 

  • Mirai Seal: The procedure for applying Mirai Seal with Mirai WBE Primer involves cleaning and preparing the surface, applying the Mirai WBE Primer for adhesion, followed by two coats of Mirai Seal (allowing proper curing between each coat), ensuring full coverage and a seamless waterproofing barrier. 
  • Mirai WPM: After applying Mirai Seal, the Mirai WPM PVC membrane is laid over the cured surface by aligning and adhering it seamlessly, ensuring proper bonding and overlap at joints, followed by adhesive application to secure the membrane for optimal waterproofing performance. 

Project Statistics: 

  • Total area to be waterproofed in our scope : 15000 sqft  
  • Total amount of MIRAI Seal : 15000 sqft 
  • Total amount of MIRAI WPM : 15000 sqft 

Hit enter to search or ESC to close